Pre-Handover (PCI) Inspections
The final list while the last payment is still in your account.
Read more →A town of seventeen thousand built on a former racing circuit, still adding streets.
Seven checks through an Oran Park build, before each stage is covered.
1 Bored piers After boring and cage placement, before concrete
2 Slab pre-pour The day before the pour, steel and formwork complete
3 Frame Once frame and trusses are up and the roof is on, before lining
4 Lock-up (pre-plaster) After roof, cladding and external doors, before plaster
5 Fixing After mouldings, doors and joinery, before the painter
6 Waterproofing After the membrane is applied and before any tile is laid
7 Pre-handover (PCI) Two to three weeks before your handover date
The final list while the last payment is still in your account.
Read more →
A visual inspection to AS 4349.1 of Oran Park's young resale stock.
Read more →
Both inspections in a single visit, each written up on its own.
Read more →
A dated photographic record before work starts on the block beside you.
Evidence to the tribunal's procedural direction where a dispute reaches it.
Every photograph on this site was taken by our inspectors on jobs in Oran Park 2570, across seventeen separate inspections. Client addresses are withheld. Client addresses withheld.










Six steps from first contact to the call at the end.
Street, estate and the stage approaching. A fixed figure comes back with nobody attending to quote.
Slab bookings move with the concrete. Tell us the pour date and we plan around it.
You tell the site supervisor an independent inspector is coming, or we make the call for you.
One to three hours by stage and house size, photographing each item in place.
Usually the same evening: location, photograph, the clause breached and what closes it.
To split the structural items from the finish list, so you know what to press for.
Owner Inspections holds 4.8 from 570+ Google reviews across Victoria, New South Wales and Queensland. Read them on Google →
Thanks Brad for your time today to inspect pre-slab stage. I'll talk to the supervisor regarding the report sent, will be in touch with you.
We recently had our new home inspected by Brad, and I can confidently say it was the best money we spent throughout our entire building process. Brad was incredibly thorough, professional, patient, and genuinely cared about doing the job properly.
The 4.8 star rating and review count above belong to the Owner Inspections Google Business Profiles for New South Wales, Victoria and Queensland. The reviews below are verified client reviews collected through our own inspection system after each report was issued, and both were left by clients at Oran Park addresses.
We inspect every estate in Oran Park 2570 and the surrounding suburbs of Catherine Field, Gledswood Hills, Harrington Park, Gregory Hills, Narellan and Cobbitty. Our Melbourne west inspectors are on site in Oran Park most weeks, so travel never adds to the price.

A fitting sealed into concrete, or a gap sealed into concrete.

Diagonal steel at internal corners, doing one specific job.

Every link is specified, and every link gets counted.
What our inspectors record across the Oran Park precincts and the streets around them.
Building new in Oran Park One masterplan, many builders, and where the difference shows.Read more →
Buying in Oran Park A young town with young resale stock, and a median above $1.2 million.Read more →
Growth and development A racing circuit until 2010, a town of seventeen thousand by 2021.Read more →
Certifiers, council and disputes Camden Council, a principal certifier, and the NSW route when it goes wrong.Read more →
Ground and soil in Oran Park A reshaped site on the Cumberland Plain, and why your soil report matters more here.Read more →
Termite collars and the slab A fitting worth a few dollars, sealed in concrete for the life of the house.Read more →
What we find in Oran Park Seventeen inspections, and where the findings sit.Read more →
Insulation and the lock-up stage The one omission that is invisible from the day the plaster goes on.Read more → Market figures are for Oran Park 2570 from OpenAgent, retrieved 10 September 2026, and the population is the 2021 Census count. Estate names were confirmed against a street address inside Oran Park NSW 2570. No suburb wide soil classification is published here, because an AS 2870 site class belongs to your lot and your own soil report, which matters more than usual on ground that has been reshaped.
Instant online pricing, or talk to the booking team on 1300 471 805.
It depends on the stage and the size of the home, and the figure reaches you before you commit. A single stage on a standard lot sits at the lower end, a full handover on a large two storey at the upper. Send the address and stage through the quote form; travel across Camden and Campbelltown is included.
Normally within the week, and often the next day where a pour or a settlement is setting the pace. Slab is the one to call about first, because it only exists between the steel finishing and the truck arriving.
Inside 24 hours of attendance, and stage reports commonly the same night. On a working site a day's delay is a day the next trade has already covered the work.
Oran Park Town replaced the Oran Park Raceway, which operated until 2010, so a good deal of the suburb sits on land that has been reshaped. What that means for your particular lot is in your soil report and your engineering, and those are the documents that decide slab design. It is a reason to read them, not a reason to worry.
It is a barrier fitted around a pipe where it passes through the slab, closing the gap that would otherwise give termites a concealed route from the ground into the building. We have recorded collars simply not installed on Oran Park pours. Once the concrete is down the penetration is sealed permanently around whatever is or is not there.
Slab and frame at a minimum, then handover. Slab because it is the only stage that becomes physically unreachable, frame because it carries the structure, and handover because it is the last point your money is leverage.
Yes. Your principal certifier attends so the construction and occupation certificates can issue, not to give you a defect list, and they are not engaged in your interest. No standard NSW residential contract shuts out your own consultant.
Stage and handover work is measured against your contract, the National Construction Code and the Guide to Standards and Tolerances 2017. Pre-purchase follows AS 4349.1 and timber pest AS 4349.3, with AS 2870 for slabs, AS 1684 for timber framing and AS 3660 for termite management.
Yes. Owner Inspections holds a NSW Fair Trading contractor licence and carries professional indemnity and public liability cover. The licence number sits in the footer of every page here.
Statutory warranties under the Home Building Act 1989 run six years for major defects and two years for the rest, from completion. The two year period closes quietly, which is why a dated written record of what was raised is worth keeping.
Everything is done by eye and by hand without breaking into anything. No service is energised or pressure tested, no ground is sampled and no engineering is certified. Where an engineer, a plumber or a licensed pest controller is needed, the report says so.
Catherine Field, Gledswood Hills, Harrington Park, Gregory Hills, Narellan and Cobbitty, plus the rest of the south west. Nothing extra is added for travel within that area.
You give the list to your builder and we ring to work through it, separating the items that affect the structure from those that affect the finish.