Bored piers
After boring and cage placement, before concrete
Depth and diameter against the engineering, cage centred with cover, bases clean and free of water
Learn more about the bored piers inspection →Seven checkpoints across an Oran Park build, each before the next trade closes the last one in.
Oran Park is a masterplanned town rather than a scatter of small releases, but a single masterplan does not produce a single standard. Dozens of builders work here and our findings vary far more between builders than between streets. Two items recur enough to name: termite collars left out of slab penetrations, and metal straps required at the top and bottom plates that were never fitted. Both are cheap on the day and permanent afterwards.

After boring and cage placement, before concrete
Depth and diameter against the engineering, cage centred with cover, bases clean and free of water
Learn more about the bored piers inspection →
The day before the pour, steel and formwork complete
Termite collars at penetrations, re-entrant corner reinforcement, cover to steel, beam widths, vapour barrier laps and seals, formwork and edge rebates
Learn more about the slab pre-pour inspection →
Once frame and trusses are up and the roof is on, before lining
Metal straps at top and bottom plates, tie down bolts, steel beam and post connections, jamb studs fixed off, junction nailing, plumbness
Learn more about the frame inspection →
After roof, cladding and external doors, before plaster
Insulation installed to walls and ceilings, cables and gas pipes clear of hot water lines, roof flashings, noggings, external doors, site grading
Learn more about the lock-up (pre-plaster) inspection →
After mouldings, doors and joinery, before the painter
Membrane protected, brickwork and mortar made good, expansion joints cleaned and sealed, balustrades installed, service penetrations caulked
Learn more about the fixing inspection →
After the membrane is applied and before any tile is laid
Flange installation and sealing, membrane protection before following trades, terminations and falls
Learn more about the waterproofing inspection →
Two to three weeks before your handover date
Downlight clearances, painting and finishes room by room, infills at openings, wet area presentation, brickwork cleaned, grading
Learn more about the pre-handover (PCI) inspection →One finding per stage, each recorded on an Oran Park build.







Pre-Handover (PCI) Inspections The final list while the last payment is still in your account.
Defect Investigation Reports A single failure, traced to what was actually required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of Oran Park's young resale stock.
Building and Pest Inspections Both inspections in a single visit, each written up on its own. Instant online pricing, or talk to the booking team on 1300 471 805.
Slab. It is the only stage where the work becomes physically unreachable, and our Oran Park set shows exactly what gets buried: collars not fitted, re-entrant reinforcement missing, cover short, beam widths inconsistent.
It means consistent planning, not consistent building. The estate controls the streetscape; your builder controls the house, and that is where the variation sits.
No standard NSW residential contract lets them refuse, and it is your property. We notify in advance and fit in around whoever is working.