Frame inspection in Oran Park

The structure while every strap, bolt and bracket can still be counted.

  • Once frame and trusses are up and the roof is on, before lining
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Oran Park inspectionSend the address and the stage due.

Fully licensed & accredited

Stage3 of 7
When to bookOnce frame and trusses are up and the roof is on, before lining
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Oran Park frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Oran Park builds

Two items dominate the Oran Park frame set. Metal straps required at the top and bottom plates and not fitted, recorded on five separate occasions. And tie down bolts missing from the bracing, recorded four times. Both belong to the same system: the chain that ties the roof to the walls and the walls to the slab against uplift. Add steel beam and post connections needing attention, jamb studs not fixed off and junctions not nailed, and the pattern is fixings rather than materials.

What we find at this stage in Oran Park

  • Metal strap required at top and bottom plates
  • Tie down bolts missing from the bracing
  • Steel beam and post connections requiring attention
  • Jamb studs not fixed off
  • Junctions not nailed off, ceiling joist hangers short of fixings
Junction not nailed off, Oran Park
Junction not nailed off
Sample findings

Sample defects found during our frame inspections in Oran Park

Annotated findings from Frame inspections on Oran Park builds. Client addresses withheld.

Metal strap required, recorded during a frame inspection in Oran Park
Metal strap required at the plates
Tie down bolt missing, recorded during a frame inspection in Oran Park
Tie down bolt missing
Steel beam and post connection, recorded during a frame inspection in Oran Park
Steel beam to post connection
Jamb stud not fixed off, recorded during a frame inspection in Oran Park
Jamb stud not fixed off

The other stages of a Oran Park build

  1. Bored piers inspection in Oran Park1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Oran Park2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Lock-up (pre-plaster) inspection in Oran Park4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Oran Park5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Oran Park6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Oran Park7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Oran Park →

Guides

Construction stage guides for Oran Park

All guides →

Book a frame inspection in Oran Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Oran Park: common questions

What is a tie down chain?

The continuous run of fixings from roof to wall to slab that resists uplift in wind. Every link is nominated in your engineering, and a missing strap or bolt breaks the chain at that point.

What time should I set aside for frame?

Two to three hours single storey and longer on a double storey, where the upper frame and its tie downs have to be reached safely and photographed.

Are straps and bolts really that important?

They are the parts of the structure specifically engineered for the loads you never see, which is why they are specified item by item and why we count them rather than glance at them.

Will the builder fix them?

Generally yes, because they are cheap at frame stage and expensive to argue about afterwards. The report gives a numbered list with photographs and locations.

Are the items rechecked?

At lock-up, and each is marked fixed, partly fixed or outstanding.

What documents should I provide?

Your engineering and its tie down schedule. Without them the report describes the frame but cannot confirm it against the design.